On Going Project

Salman Offshore Production - EPC 3

 

 

Salman Offshore Production - EPC 3

Project Name: Salman Offshore Production (EPC 3)
Client: Petro Iran Development Company (PEDCO)
Status: Completed
Field Location: Persian Gulf, 144 Km to the south of Lavan island

 

Objectives:

Transferring 50,000 barrels oil and transferring and extraction of 540 MFT export gas 3 to AP Mobarak platform

 

Scope of Work:
  • Basic design endorsement
  • Detail engineering
  • Procurement
  • Pipes cement lining
  • Cut and fill
  • Shore pulling
  • Subsea pipe laying
  • Crossing، Free Span Correction

 

Facilities:

          10 new 4 gas lines. (23.3 KM)

          11 new 8 and 10 oil gathering lines. (25.6 KM)

          Two 20 lines. (8.1KM)

          One 6 line. (3.3 KM)

          One 14 line. (2.6 KM)

          One 36 line. (0.63 KM)

          One 30 line. (213 KM)

          Four high voltage cable and fiber optic. (Detail design and procurement)

 

 

 

 

 

 
          

 

Home | Photo Gallery | Interests | About Me | Favorites | Feedback