Project

         

 

 

On Going Projects List
Row Project Title Client Location Status Start Date Detail
1 South Pars Gas Field Development - Phase20&21 Persian Gulf Pars Oil and Gas Co. On going 1388
2

South Pars Gas Field Development - Phase 19

Persian Gulf Pars Oil and Gas Co. On going 1387
3 Foroozan Field Development Operations And Production Enhancement Persian Gulf Petro Iran Development On going 1386
4   South Pars Gas Field Development - Phases 17&18 Persian Gulf Pars Oil and Gas Co. On going 1384

 

Completed Projects List

Row

Project Title

Client

Location

Status

End Date

Start Date

Detail

1

Abouzar Offshore Production Complex Renovation Extension

National Iranian Oil Co.

Persian Gulf

Completed

1374

1380

2

Balal Platforms

Elf Petroleum Iran

Persian Gulf

Completed

 1378

1382

3

South Pars Gas Field Development, Phase 1Jackets

Petropars Ltd

Persian Gulf

Completed

1377

1382

4

  South Pars Gas Field Development - Phases 9&10

Pars Oil and Gas Company

Persian Gulf

Completed

1381

1387

5

Salman Offshore Production - EPC 3

Petro Iran Development

Persian Gulf

Completed

1386

1388

                1994

      Installation and commissioning of Rotary Machine in Bojnourd petrochemical urea plant.
1995

       Installation of Rotary Machine in Tabriz petrochemical plant
       Trays of tower assembly in Tabriz petrochemical plant.
       Piping fabrication of Tabriz petrochemical plant.
       Installation and modification of 7 Reactors in Tabriz       petrochemical  plant.

1996

       Overall test of Tabriz petrochemical plant.

1997

*      Installation and commissioning of Rotary Machine and Vacuum Tower in Bandar Abbas refinery.

             2001 2003

*      Installation of Rotary Machine in Gachsaran gas refinery (NGL-1200)

*      Installation and commissioning of HVAC (NGL-1200)

*      Installation of CO2 fire fighting (NGL-1200).

*      Checking of piping engineering documents of Khouzestan petrochemical Co. (engineering polymers plant- EP).

*      Piping and equipment design and modelling (EP-project)

*      Supporting and PDMS modelling for units 40 50 (EP-project)

       Piping modification for units 502 503 (EP-project)
       Design and modification of pipe racks (EP-project).
       Checking and modification of isometric drawings and preparing of line list & documents.
       Preparing of piping layout (EP-project).
       Checking and modification P&ID, piping design of all lines(SHAHID TONDGOOYAN Petrochemical Co. Pet II).
       Preparing of Isometric Drawings (Pet II).

 
 
             Since 2004 - 2008
  
Manufacturing, fabrication and  
   installation of STEEL STRUCTURE
   in PARS OIL Co. (Revamp-project).

  
Piping,  design and modelling
    (Revamp-project)
  
Design and modification of Cable-
    Racks (Revamp-project).

  
Checking and modification of
   isometric drawings and preparing of
   line list & documents (Revamp-
    project).

  
Checking, calibration and installation
    of instruments (Revamp-project).

   
Support by civil projects
     2004

    Maintenance and technical support  
    of  Tehran Refinery.
 

Home | Photo Gallery | Interests | About Me | Favorites | Feedback